Show / Hide Table of Contents

homepage

Inspection Card

To create a record of service inspection:

  • Search Lots, open the Lot card, and run the action "Inspections".
  • This will open the page Lot Service Inspections. Press the button "New".
    • It will open an Inspection Card.

To learn about how to actually perform an inspection read Performing an Inspection

Field Definitions

The Inspection Card contains the following fields:

  • No.

    • The Number assigned to the Inspection within the company. It is auto-numbered using No. Series specified in the HomeBuilder Setup.
  • Inspection Type.

    • Type of Inspection such as Quality Care, Pre-Delivery Inspection, 30-Day Inspection, Emergency Call, etc. It is selected from the table "Inspection Types" defined in Setup.
  • Inspector Code.

    • Code of the inspector selected from table "Service Inspectors" defined in Setup.
  • Status.

    • The Status has the following options:
      • Open: Initial status.
      • Released: Signifies that the Inspection record is prepared for the inspection by an office clerk.
      • Performed: Signifies that the service inspector has completed the inspection.
      • Completed: All service issues have been resolved.
  • Date Reported.

    • This field is used to record the date when a purchaser reported issues within the warranty period. For quality care (QC) or pre-delivery inspection (PDI), enter the inspection date.
  • Scheduled Date.

    • This field is used to record the date of planned inspection such as QC or PDI inspection. For other inspection types, enter the date when the issues were reported.
  • Date Performed.

    • This field is used to record the date when QC or PDI inspection was performed. For all other inspection types, enter the date when the issues were reported.
  • Time-in.

    • Time when the PDI inspection was started.
  • Date Completed.

    • Date when the last issue for the inspection was resolved.

Action Buttons on the Inspection Card

While on the Inspection Card, click:

  • Checklist.

    • This Action Button will lead you to the Check List Entries page.
    • Click Checklist to navigate to the Help File article about it.
  • Release.

    • This action releases the Inspection record for inspection and makes using actions on the checklist possible. It changes the Status of the Inspection to 'Released'.
  • Reopen.

    • This action reopens the inspection and changes its Status to 'Open'.
  • Print.

    • The report to print PDI report has the option whether or not to print signatures.
    • This action prints the report on the inspection according to the report ID specified for the Inspection Type.
  • Mark as performed.

    • This action changes the Status of the Inspection to 'Performed' which locks the Inspection from editing.
  • Planning Lines.

    • This page called from Inspection Card shows planning lines created for the work orders of the inspection. When necessary, enter Unit Cost for future purchases.
  • Send by Email.

    • This action allows a user to send an inspection report to the customer assigned to the lot.
  • Sent Emails.

    • This action provides the ability to view the emails sent for the inspection.
In This Article
Back to top Generated by DocFX